北京藍(lán)天飛行翻譯有限公司完成RNP運行和氣壓垂直導(dǎo)航運行的批準(zhǔn)指南咨詢通告翻譯任務(wù) Translation of AC 90-105A Approval Guidance for RNP Operations and Barometric Vertical Navigation in the U.S. National Airspace System and in Oceanic and Remote Continental Airspace
在美國國家空域系統(tǒng)和海洋以及偏遠(yuǎn)大陸空域進(jìn)行RNP運行和氣壓垂直導(dǎo)航運行的批準(zhǔn)指南的主要內(nèi)容包含有:
• Required Navigation Performance Approach (RNP APCH) procedures;
• Barometric vertical navigation (baro-VNAV);
• RNP 1 (terminal) operations;
• RNP 0.3 (rotorcraft) operations;
• RNP 2 domestic, offshore, oceanic, and remote continental operations;
• RNP 4 oceanic and remote continental operations;
• RNP 10 (Area Navigation (RNAV) 10) oceanic and remote continental operations;
• Advanced Required Navigation Performance (A-RNP), and
• Additional Capabilities.
General Information
Purpose
Alternative Method
Applicability
Audience
Approach Guidance Not Applicable to this AC
Terms
Major and Minor Failures
References
Aircraft Eligibility and Aircraft Modification
Documentation
Cancellation
FAA ACs and Orders
Related Regulations Title 14 of the Code of Federal Regulations (14 CFR)
FAA Technical Standard Orders (TSO)
RTCA Documents
Other Documents
General Information
Performance-Based Navigation (PBN) Concept
Components
Lateral Performance
Vertical Performance
Onboard Performance Monitoring and Alerting
Procedures and Routes
Navigation Error Components/Definitions
Flight Technical Error (FTE) or Path Steering Error (PSE)
Path Definition Error (PDE)
Navigation System Error (NSE) or Position Estimation Error (PEE)
Total System Error (TSE)
Position Estimation Error (PEE) or Navigation System Error (NSE)
Applications of Required Navigation Performance (RNP) Operations
Overview
Operational Guidance For Required Navigation Performance (RNP) Operations
General
Centerline
RNP En Route, RNP Terminal, and RNP APCH Operations
RNP Operational Transitions
Transitions to Instrument Landing System (ILS), Ground Based Augmentation System (GBAS) Landing System (GLS), Localizer Performance with Vertical Guidance (LPV) or Conventional Approach Procedures
Oceanic/Remote Continental Airspace and Offshore Airspace
Airspace Distinction
Operational Approval Process
Part 91 Operators
Operational Authorization
Parts 91K, 121, 125, 129, and 135 Operators
Preapplication Meeting
Multiple OpSpecs/MSpecs/LOAs
|