時(shí)間:2015-10-20 16:37來源:藍(lán)天飛行翻譯公司 作者:公務(wù)機(jī)翻譯 點(diǎn)擊:次
北京藍(lán)天飛行翻譯公司完成公務(wù)機(jī)公司的第34版龐巴迪挑戰(zhàn)者605全套飛行手冊(cè)翻譯任務(wù) REVISION 34: Sep 03/15 Bombardier Challenger 605 Flight Manual Translation 第34版龐巴迪挑戰(zhàn)者605飛機(jī)飛行手冊(cè) Bombardier Challenger 605 Airplane Flight Manual
主要更新有 Introduces the following changes to the Airplane Flight Manual:
• Clarification of wait time for 14th stage bleed duct failure.
• Incorporate single engine procedure into appropriate procedures and delete single engine procedure.
![]()
第34版龐巴迪挑戰(zhàn)者605機(jī)組操作手冊(cè) Bombardier Challenger 605 Flight Crew Operating Manual
主要更新有:
Revision to Volume 1 introducing changes to reflect Airplane Flight Manual revision 34: Emergency, and Abnormal Procedures.
Revision to Volume 1 to clarify AC essential bus verification during ADG in-flight check.
Revision to Volume 2 to make minor editorial corrections.
|